STI team perform geotechnical and hydrogeological analysis on complex failure that occurred in Block E-F Pit South Roto and determine appropriate post failure handling.
STI team analyze current conditions and the final conditions stability of the mining area of South Roto Pit and performs optimization of the pit design.
STI provides geotechnical team training covers theory, software exercise, and case studies directly in the client work area. Followed by the owner and the contractor in the client work environment.
The annual program of PT STI regarding geotechnical training. Covers the theory and practice of software. In 2016 held in Bandung and attended by 41 participants from various mining and non-mining industries.
PT STI analysis of slope stability Rajamandala hydropower development work powerhouse.